Hydropower workers recount tunnel flood as Nepal rescue efforts continue
Just the facts

Hydropower workers recount tunnel flood as Nepal rescue efforts continue

Summary

A Nepalese hydropower worker described how floodwaters from the Trishuli River burst into a tunnel, prompting a large-scale rescue operation as the death toll from the flash floods exceeds 1,000.

A worker on the Upper Trishuli 3B Hydropower Project said water from the Trishuli River surged into a tunnel under construction after a sudden gust of wind lifted debris and displaced machinery. Pemba Dundu Tamang, whose team was lining the tunnel, ran for about 20 minutes as the floodwater followed him uphill, eventually reaching the village of Shanti Bazar where he and other survivors took shelter until the army arrived.

The floods, which have killed more than 1,000 people and left around 4,000 missing, have devastated homes along the river. Tamang reported that his house was completely destroyed and that several of his relatives perished.

The Nepal Army, represented by spokesman Raja Ram Basnet, said soldiers are conducting search-and-rescue operations in the tunnels, retrieving bodies and working to prevent disease spread. Engineers are pumping air into the tunnels to aid trapped workers, while specialists from China, India and Nepal continue to clear debris with excavators and heavy machinery.

Experts monitoring the glacier upstream noted accelerated ice movement, brown meltwater and a developing crack in the rock in the days before the disaster, suggesting increased instability. They said while the avalanche itself moved too quickly for conventional warnings, a comprehensive early-warning system downstream could have reduced casualties.

The Upper Trishuli 3B plant, slated to open next year, is part of Nepal’s effort to expand hydropower, which supplies over 99% of the country’s electricity.

Source

BBC

Keep reading — for free

Create a free account to follow the news. No card required.