NASA Conducts Second Wet Dress Rehearsal for Artemis II Moon Mission
Միայն փաստեր

NASA Conducts Second Wet Dress Rehearsal for Artemis II Moon Mission

Ամփոփում

NASA performed a second wet dress rehearsal for the Artemis II mission, addressing previous technical issues to prepare for a potential March 6 launch.

NASA conducted a second wet dress rehearsal for the Artemis II mission on February 19, aiming to validate the Space Launch System (SLS) rocket's readiness for a crewed lunar flyby. This follows an earlier attempt in early February that was cut short due to a liquid hydrogen leak.

During the rehearsal at Kennedy Space Center in Florida, engineers loaded over 700,000 gallons of supercooled liquid hydrogen and liquid oxygen into the SLS rocket and ran a simulated countdown. The primary objective was to confirm the integrity of newly installed seals after the previous test was disrupted by hazardous hydrogen leaks.

The Artemis II mission plans to send four astronauts—three Americans and one Canadian—on a 10-day journey around the Moon. This will be the first crewed lunar mission since 1972. If the recent tests are successful, NASA aims to set a firm launch date, with the earliest possible opportunity being March 6.

NASA Administrator Jared Isaacman emphasized astronaut safety and announced plans to redesign fuel connections to prevent future leaks. He also criticized Boeing and NASA leadership over safety issues with the Starliner program, which recently left astronauts stranded on the ISS.

The results of this test are crucial in determining whether the Artemis II mission can proceed as scheduled.

Աղբյուր

Deccan Chronicle

Շարունակեք կարդալ — անվճար

Ստեղծեք անվճար հաշիվ՝ նորություններին հետևելու համար։ Քարտ չի պահանջվում։